It's getting more and more ready... air-conditioning system was installed, all the toilets' doors were there (one of the toilet's door comes with a full-length mirror), the kitchen cabinet is almost done (left the solid top...), the tv-console is also almost done... and I have asked Jackson to do up some additional carpentry for my bedroom and my mum's room... basically to do up some cabinets to fill up the useless "holes" under the windows. The wrought iron gate was also installed!
What's left are:
- Kitchen's cabinet solid top
- A door between the master bedroom to service balcony (walk-way to my new toilet... this is a last minute add-up I've asked Jackson to do, in additional to the carpentry mentioned above)
- Other miscellaneous stuff such as my taps, my mum's toilet's bars for elderly people to have better grips...
Think I can move in soon... hopefully soon. :)
See the photos below!
What's left are:
- Kitchen's cabinet solid top
- A door between the master bedroom to service balcony (walk-way to my new toilet... this is a last minute add-up I've asked Jackson to do, in additional to the carpentry mentioned above)
- Other miscellaneous stuff such as my taps, my mum's toilet's bars for elderly people to have better grips...
Think I can move in soon... hopefully soon. :)
See the photos below!

No response to "Progress #6"
Post a Comment